Desert market finds · Free shipping over $70 · Shop adobe edit

Assessment Kit-SITHPAT019 Model sugar-based decorations MSM Units of competency SIRXRSK002 Maintain

SKU: 30902849529
4.1
USD113.75 USD134.75

Pay in 4 interest-free payments of $28.44 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 5 - Aug 10

Description

Units of competency SIRXRSK002 Maintain store security SIRXHWB002 Promote workplace health and wellbeing SIRRINV002 Control stock SIRXWHS003 Maintain workplace safety SIRXCEG008 Manage disrespectful

Core units AHCWHS301 Contribute to work health and safety processes AHCWRK309 Apply environmentally sustainable work practices Elective units AHCBIO301 Identify and report signs of unusual disease or pest Group A AHCCHM304 Transport and store chemicals Group A AHCCHM307 Prepare and apply chemicals to control pest

Units of competency HLTAHW071 Manage medicines in Aboriginal and/or Torres Strait Islander primary health care HLTRNL002 Provide care and support to a person undergoing renal replacement therapy HLTRNL001 Support a person with chronic kidney disease HLTAHW020 Administer medications If you require RPL Kits with comprehensive benchmarking

policies and procedures in the construction industry CPCWHS3001 Identify construction work hazards and select risk control strategies Elective Units CPCCCA3019 Erect and dismantle formwork to suspended slabs

policies and procedures in the construction industry CPCSHP3001 Fabricate shopfitting components using CNC machines CPCSHP3002 Fabricate and assemble shopfront structures CPCSHP3003 Assemble and install shopfront structures CPCSHP3004 Assemble internal shopfitting units and prepare for transport CPCSHP3005 Apply and trim decorative additions to shopfittings and components CPCSHP3007 Install prefabricated internal shopfitting units CPCSHP3008 Install internal shop walls and fixtures Elective units CPCSHP3006 Prepare shopfittings and surfaces and apply liquid finishes CPCSHP3009 Demolish shopfronts and bulkheads CPCSHP3010 Prepare shop floors for new coverings CPCCWC3004 Install suspended ceilings CPCCCM2010 Work safely on scaffolding higher than two metres CPCCCM3005 Calculate costs of construction work If you require RPL Kits with comprehensive benchmarking

Assessment Kit-SITHPAT019 Model sugar-based decorations MSM Units of competency SIRXRSK002 MaintainOur assessment resources contain everything you need to begin assessing your learners. Our assessment resources include: Assessment Pack (Student) Trainer Assessment Pack (Marking Guide) Mapping for each unit of competency Assessment Record Tools Our assessment resources have been aligned to learner cohorts, industry needs and ACSF indicated levels. In order to achieve this, we have conducted: Industry consultation Robust validations Assessment of

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products