Desert market finds · Free shipping over $70 · Shop adobe edit

RPL Kit-UEERL0004 Disconnect - reconnect electrical equipment connected to low voltage (LV) installation wiring RII Units of competency AHCWRK502 Collect

SKU: 69908517721
4.2
USD140.00 USD186.00

Pay in 4 interest-free payments of $35.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 27 - Sep 1

Description

Units of competency AHCWRK502 Collect and manage data AHCWRK510 Audit site operations BSBINS401 Analyse and present research information AHCIRG507 Audit irrigation systems AHCWRK513 Write and present reports AHCIRG438 Select and manage pumping systems for irrigation AHCIRG435 Determine hydraulic parameters for an irrigation system If you require RPL Kits with comprehensive benchmarking

Core units MSMENV272 Participate in environmentally sustainable work practices MSMWHS200 Work safely MSMSUP210 Process and record information MSS402051 Apply quality standards Elective units MEM03001B Perform manual production assembly MEM03006B Set assembly stations MEM09002B Interpret technical drawing MEM09204A Produce basic engineering detail drawings MEM11005B Pick and process order FWPCOT2238 Cut materials with a hand-held chainsaw HLTAID003 Provide first aid MSTGN3009 Coordinate work of team or section MEM13003B Work safely with industrial chemicals and materials MEM16006A Organise and communicate information MEM16007A Work with others in a manufacturing

Units of competency SIRRFSA001 Handle food safely in a retail environment FBPFST4014 Apply sensory analysis in food and/or beverage production FBPTEC4003 Control food contamination and spoilage FBPCHE4001 Prepare and present cheese * We can develop additional elective units that are not listed on request (Please contact us for further information)

Units of competency MSMWHS212 Undertake first response to fire incidents MSMPER202 Observe permit work MSMWHS200 Work safely MSMPER200 Work in accordance with an issued permit * We can develop additional elective units that are not listed on request (Please contact us for further information)

Units of competency FBPOPR2088 Operate pumping equipment FBPOPR2094 Clean equipment in place FBPOPR3016 Operate and monitor a separation process FBPOPR3011 Operate and monitor a heat treatment process * We can develop additional elective units that are not listed on request (Please contact us for further information)

RPL Kit-UEERL0004 Disconnect - reconnect electrical equipment connected to low voltage (LV) installation wiring RII Units of competency AHCWRK502 CollectOur RPL Kits are developed to assist in making valid assessment decisions whilst remaining compliant with training standards. The RPL Kits are written for each qualification and include carefully designed documentation and simple instructions for evidence submission. The kit is designed to cover all units requirements with a range of appropriate assessment methods. Our RPL Kit includes six steps: Stage 1: An RPL Application Form and Information

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products